• Quality Assurance (QA) Documented via Bolster Systems, Tailored to Each Individual Scheme

    • Drywall Partitions & MF Ceilings

    • Passive Fire Protection (IFCC 3887)

    • Steel Frame Systems (SFS)

    • Suspended Ceiling Systems, Mass-Barrier Ceilings & Semi-Exposed Soffit Linings

    • Decorative Bulkheads, Coffered Ceilings & Coving

    • Traditional & Flowing Screed

    • Acoustic Flooring

    • Rendering

    • Concealed Conduit & Backbox Installation

    • Tape & Jointing & Skim Finishes

    • Airless Spray Plaster Finishes

Established in 1994 and incorporated in September 2000, Medlock Dry Construction is one of the leading specialist Dry Lining contractors in the South East. Our service, delivery and ability to repeatedly produce the highest standards of quality has helped to establish a strong reputation, ensuring repeat business for a number of valuable clients.

These contracts range from small local projects to multi-million new build developments and regeneration schemes. These are predominantly situated across London and the South of England and are delivered through our commercial and residential divisions.

With 30 years in business, we are proud for being recognised as one of the most venerated contractors within our sector. Dedication, support and care is a theme throughout our business and we will continue to adopt this approach for all of our clients to ensure we continue to deliver exemplary standards of work.

2024 New Markets

QUALITY ASSURANCE

The business has introduced a new Quality Assurance (QA) application in collaboration with Bolster Systems to produce comprehensive records of all Drylining production and compliance documentation tailored to each individual contract. Identify, manage and mitigate operational and safety risks are the key components to this introduction, whilst delivering clear and consistent audit trails at each phase of work to our clients. One of the main aims is for the workforce to stay up to date with the drywall manufacturer build guidelines, plus all H&S topics and any subsequent updates.

PASSIVE FIRE PROTECTION

In June 2024, the business successfully completed the audit and assessment requirements for the certification as a passive fire protection contractor. This provides a platform to merge Drylining and Fire Protection scope packages for clients on all future developments. Certificate number: IFCC 3887

1994 - 2024